The ESMS will describe the system and associated plans that HDFC will put in place for the life of the Project for implementation.

Scope of Work

The scope of ESMS for HDFC will act as a comprehensive mechanism at the Corporate & Project levels to lay down a rationalized protocol to assess and mange overall environment and social risks and impacts associated with the project life cycle of 50MW (AC) Solar Park at Sutiakhali, Mymensingh.

Read More
Project Level Procedures (PLP)

The Project Level Procedures (PLP) would provide guidance for management of E&S issues associated with the project level at the construction and operation phase in line with Good International Industry Practices (GIIP), IFC Sustainability Framework, 2012 and applicable national regulatory requirements.

Read More
  • HDFC
    Mission Statement
  • HDFC
    Vision Statement
  • HDFC
    Value Statement
Mission Statement

Company implementation

THE ESMS WILL DESCRIBE THE SYSTEM AND ASSOCIATED PLANS THAT HDFC WILL PUT IN PLACE FOR THE LIFE OF THE PROJECT FOR IMPLEMENTATION.

  • Scope of Work
  • General Policy
  • Environmental, Social, Safety and HR Policy
  • Role and Responsibility
  • Corporate Control Procedures
  • Project Level Procedures
Vision Statement

Environnemental & Social Management System (ESMS)

The ESMS takes over where the EIA/ ESIA Reports leave off and focus on the processes and plans necessary to ensure social and environmental commitments and mitigation measures.

  • Environment Health and Safety (EHS) Management
  • Occupational and Community Health and Safety Management
  • Grievance Redressed Mechanism (GRM)
  • Stakeholder Engagement Plan (SEP)
  • Emergency Preparedness and Response
  • Waste Management Plan
  • ESMS Assessment (Self & External-Scores) Tools
Value Statement

CONSTRUCTION STATUS

MMS Foundation and Structure and Solar PV Module

  • MMS Foundation and Structure and Solar PV Module
  • Box Transformer
  • 132kV Transmission Line
  • 132kV Project Substation
  • Admin and Control Building, Ware House
  • Aerial View
// \\
Service areas

Our Service

The scope of ESMS for HDFC will act as a comprehensive mechanism at the Corporate & Project levels to lay down a rationalized protocol to assess and mange overall environment and social risks and impacts associated with the project life cycle of 50MW (AC) Solar Park at Sutiakhali, Mymensingh.

CCP
Corporate Control Procedures (CCP)

Corporate Control Procedures (CCP) is developed to define resources responsibilities and authority ...

PLP
The Project Level Procedures (PLP)

The Project Level Procedures (PLP) would provide guidance for management of E&S issues...

SEP
Stakeholder Engagement Plan (SEP)

Stakeholder Engagement Plan is developed with the aim of explaining how HDFC SinPower ...

WMP
Waste Management Plan (WMP)

This WMP is an outline of the waste management on site and 132kV Transmission Line and must be followed by all....

//
Services

Our efficient solutions

The ESMS will describe the system and associated plans that HDFC will put in place for the life of the Project for implementation

CONSTRUCTION STATUS

Box Transformer

CONSTRUCTION STATUS

Box Transformer

Lorem ipsum is a placeholder text commonly used to demonstrate the visual form of a document or a typeface without relying on meaningful content. ...

CONSTRUCTION STATUS

132kV Transmission Line

CONSTRUCTION STATUS

132kV Transmission Line

Lorem ipsum is a placeholder text commonly used to demonstrate the visual form of a document or a typeface without relying on meaningful content. ...

CONSTRUCTION STATUS

Aerial View

CONSTRUCTION STATUS

Aerial View

Lorem ipsum is a placeholder text commonly used to demonstrate the visual form of a document or a typeface without relying on meaningful content. ...

//
Gallery

Project Photo Gallery

[ PROJECT PROGRESS ]
50MW SOLAR PV PLANT PROJECT
[ CONSTRUCTION STATUS ]
Box Transformer
[ CONSTRUCTION STATUS ]
Substation Gantry To
[ CONSTRUCTION STATUS ]
Project Substation month of February
[ CONSTRUCTION STATUS ]
Admin And Control Building Month o